There is not enough space available for future new experiments. Therefore, the Mont Terri Partners have decided to extend the rock laboratory in order to have enough new space by 2008 and the partners are able to continue their research under the best possible conditions. This extension is called the Gallery 08.
The planning has started: budget, time schedule and programme. In April 07, potential mining contractors are invited to submit an offer. Authorisation of the Gallery 08 is expected in July 07 and mobilisation and installation work will presumably start in November 2008. A plan of the Gallery 08 is here available.
The Gallery 08 has been excavated and lined (Consortium ATNB-mtp), with a total length of 167 m and about 60 m of niches. Break through was on 25 August 2008. The Gallery 08 was ready by end of December 2008, according to the time schedule. Effective costs did exceed the budget by less than 1%.
Completion of installations in Gallery 08, including a new alarm system, which is connected to the Mont Terri highway tunnel. Start of new experiments in the Gallery 08: Mine-by test (MB)and Hydrogen transfer (HT).
Start of Phase 15. |